daniel jubb造句
例句與造句
- Development testing of the initial Bloodhound SSC hybrid rocket motor was conducted by Daniel Jubb of The Falcon Project with tests conducted in 2008-2013.
- This 3 October 2012 report was televised on the Bloodhound SSC hybrid rocket fabricated by The Falcon Project Ltd with Daniel Jubb as director, which was successfully tested in public at Newquay, GB . Due to escalating costs caused by control system delays, the hybrid rocket for Bloodhound will instead be developed by Nammo.
- Publicly disclosed tests were conducted in 2009 and 2012 including a run at Newquay Airport in GB . In addition Daniel Jubb designed, manufactured and test fired a full diameter 18 " monopropellant HTP thruster for the subsonic ground tests for Bloodhound SSC . " The Bloodhound team had been developing its own hybrid power unit in collaboration with Manchester based Falcon Project Ltd, and gave this rocket its first UK test firing in October 2012.
- It's difficult to find daniel jubb in a sentence. 用daniel jubb造句挺難的